Profile
Andrew Gore
-
About Me:
Now retired so nothing exciting. Games of football 3 times a week and mentoring students once or twice a week.
-
My Work:
I am Professional Chartered Engineer, over 35 years experience gained in a Multi-Discipline, Operations, Project and Engineering environment in a variety of Industries, Mining, Glass Manufacture, Food Industry, Petro Chemical and Oil and Gas.
-
Read more
CURRICULUM VITAE
Andrew Gore, C.Eng., M.Inst.M.C.
A Professional Chartered Engineer, who is a self-motivated team builder/player, with over 30 years
experience gained in a Multi-Discipline, Operations, Project and Engineering environment. This period
has encompassed the full Supply Chain of Project & Engineering Management from the
Operating/Development Initiation/FEED through Design, Construction and Commissioning. In addition
the Commercial, Business & Bid Management experience, with a number of different types of
companies, provides a commercial awareness, knowledge and insight to the drivers required at all
stages of a Project. This experience has been accumulated in a variety onshore & offshore areas,
including Topsides, Jacket, Export Pipelines & Facilities Installations, Subsea Completions/Controls &
Pipelines, FPSO Design, DSV (Sat Diving) Build, Systems Commissioning & Services, Drilling Completions
& Subsea BOPs’. This background includes the pre-requisite dealings with the Statutory & Regulatory
organisations and procedures along-with the required Project Funding projections.
Specific/Related Skills
Developed Concepts & Studies for Greenfield and Brownfield developments.
Produced Project justifications, presentations and cash flow projections.
Establish Project Teams of varying sizes to complete, or lead, the projects.
Completed Topsides & Subsea Projects from inception thru design/construction to completion.
Liaison with HSE /regulatory/verification bodies to gain acceptance of standard and unique designs.
Developed ITT’s, Bid Proposals and Procurement Strategies for Projects.
Detailed Professional Experience: –
Rawwater Engineering
Oct 2014 to Nov 2015
Consultant
Providing Engineering Design input to the Development of a unique Well Isolation Device.
Liaison with Certification Companies to successfully attain Approval to International standards.
Wood Group Engineering
Jul 2009 to May 2013
Project Manager
Shell UK: Gannet Re Development Project FEED and Concept development
Studies Group: Develop Front End Studies/FEED’s for various clients.
Chevron Project: Project Manager for a variety of offshore Multi-Discipline Projects.
Divex Global Ltd
Sep 2008 to Jul 2009
Project Manager
Project Manage EPC of New Build Deep Water Saturation Diving Facility for a DSV’s in South
Asia/Singapore and assist client with Vessel Design and Build.
Wood Group Engineering
Jan 2008 to Sep 2008
Project Engineering Manager – BP Aurora Project
Manage Engineering Design, Procurement and Fabrication of a Major On-Shore Fractionation Plant
being built for BP in Sullom Voe
Technip UK Ltd
Jan 2007 to Jan 2008
Project Manager
Project Manage 2 off New Build DSV’s for the UK & Norwegian Sector complete with ‘state of art’
Deep Water Saturation Diving Facility
Full Front End Design, Implementation/Build and Budget Control of the 2 major DSV Projects. (£75m
& £100m CAPEX)
KBR PS Ltd
Nov 2004 to Dec 2006
Project Manager
ConocoPhillips SNS Projects Manager:
Manage all SNS OPEX & CAPEX Modification Projects on the Viking LOGSS & CMS Gas Platforms
Sangu Production Project:
Project Manager responsible for Turnkey Project in Bangladesh
Development of Design in UK office for Logistics of an NUI platform Construction Team, Procurement
and Supply of Equipment and Resources form different parts of Europe, Malaysia and Bangladesh.
Project consisted of a major Platform Production Expansion and Development of a contingency ‘Fast
Track’ alternative to successfully achieve First Gas 6/8 Weeks early.
Costain-Petrofac Ltd.
March 2004 to Nov 2004
Project Manager
HRL/British Gas Heysham Engineering Contract: On Site Multiple Project delivery contract.
Developed & Installed Riser Impact Protection System
Produced Concept & High level Estimate for Primary and Satellite Simplification Project within the
constraints of first year start up and a Full Shutdown Workscope
Developed new Team whilst maintaining existing personnel on contract and initiated succession
resources
Wood Group Engineering
June 2000 to March 2004
Project Manager
Talisman Tartan Project: Project Manager responsible for Engineering Design, Procurement,
Construction & Commissioning of a Produced Water Upgrade, Exhaust Change out and ongoing
Brownfield Modifications.
Previous Positions
Texaco Eng. & Construction Contract: Control of all Engineering & Construction services for the
Texaco facilities, Captain FPSO & Erskine Platform’s plus Talisman platforms & onshore terminal work at
Flotta.
Corporate Roles: Responsible for the E&I Engineering disciplines technical quality and resource
provisions. Control of Graduate recruitment and development. Acting as Team Leader during bid
development.
NAM ISC: Control of all Departmental Engineering & Construction ISC services from Inception to
Completion. Responsible for team building/recruitment, technical quality, delivery of projects, and
management of interface services of all NAM’s onshore Gas Handling Plant (Den Helder) & offshore
facilities projects
Silvertech Aberdeen Ltd.,
April 1999 to June 2000
General Manager.
Set up Aberdeen office & establishing business development in the area.
Secured and operated the contracts for Support of the Maersk Curlew, Kerr/McGee Janice & BP
Schehaillion FPSO Subsea & Topsides Systems as well as 3rd Party Modification Projects.
Cameron/Brisco Ltd.,
April 1996 to April 1999
Project Manager BOP & Drilling Controls.
Commercial, Technical & Contractual responsibility for New Build BOP Projects on Major Subsea Drilling
contracts.
Provision of Bid Management Services, and Safety Reviews, for Drilling & Subsea Developments.
Projects & Technical Manager –
Technical + Commercial Control of all Subsea/Topsides Proposals, Design/Manufacture Contracts.
Typical contracts included the SLP North Sea Producer, Bluewater Glas Dowr, Conoco Banff FPSO’s.
etc.
Providing Downstream Technical Services and Operational Safety Deployment Reviews.
TOTAL OIL MARINE Ltd.
March 1989 to April 1996
Project Engineering Manager-DAM Project
Completed Multi-Discipline Engineering Design, Construction and Commissioning of a Major Revamp
Project on an existing Platform with an overall budget of £34 Million.
Topsides Separator (600Te) and Fired Heater (50Te) Module Designed and Fabricated in UK Yard
Lifted and integrated onto Alwyn North along with Power and Water Injection Export facilities
Integrated Module Design with Hereema to Facilitate Heavy Lift and Location on Alwyn North
Completed the Topsides & Subsea Interfaces for all Export and Import of Hydrocarbon, Injection
Water, Electrical and Communication Supplies
Achieved complex, novel design modifications, including Electrical Generation/Export & Switchgear
Installation, Slug/Multiphase Flow, High Integrity High Speed Protection Systems, Reliability
Assessments, Acoustic Induced Vibration in Riser & Pipe Systems, Flare Over-Load & Radiation concerns.
Developed Specialised Procurement Risk & Reward Target Oriented Strategy for System Design &
Supply.
Achieved, within time and below budget installation of onshore pipeline export project at the St Fergus
onshore Gas handling facility.
BP PETROLEUM DEVELOPMENT LTD.
Jan. 1988 to March 1989
Senior Engineer
Completed Front End Design and Philosophy preparation on Artificial Lift System for Forties Field.
Assessed relative complexities and cost benefits of Gas versus ESP Well Lift Facilities.
Concluded Third Party Reliability & Computer Dynamic Simulation Studies to determine Control & High
Integrity Protection Safety Shutdown System.
Brown & Root Vickers Ltd.
April 1985 to Dec. 1987
Principal Engineer
Employed in a variety engineering & project roles in the UK and Norway for different clients, as follows:
Leading an International Engineering team to complete the topside and subsea system for a field
development onto an existing platform/production facility (Tommeleiton Field Devl).
Preparing Initial Conceptual proposals for the Snorre TLP Platform.
Wood Group Eng. Design Ltd.
1984 – 1985
Senior Engineer:
Preparing conceptual and detailed proposals for Well Kill Fluid handling, On-Line Sampling system.
REYROLLE – BELMOS LTD.
1982 – 1984
Applications Engineering Manager:
Responsible for the overall Departments role in Equipment Sales Costings, Design, Development and
Completion to Manufacture of company’s range of industrial & flameproof equipment.
ARABIAN BUSINESS & MANAGEMENT SERVICES
1980 – 1982
Engineering Manager:
Prepared and issued companies main bid proposals for all Design Contracts.
Recruited and trained a Multi-National team off 60 Engineers and Draughtsmen (UK, US, Thai &
Pakistani) who, under my direction, produced mechanical, civil, electrical & instrumentation design
modification packages for ARAMCO.
Typical projects included ESD Systems for G.O.S.P.’s and NGL Plants, Crude Oil Shipping Systems &
Flow Measurement, Electrical Overland & Refinery Distribution & Protection Systems, Overland Oil and
Water Flowlines Pump and Piping Installations.
Devro Ltd., Moodiesburn.
1976 – 1980
Project Manager:
Controlled the Engineering Department, which implemented company projects, based in the Food
Industry, from inception, costing, and design into construction and commissioning.
Completed the Technology Transfer of a process from a German factory to the Home Based production
line.
Completed a major Design, Build and Commission of a Production Facility in Australia using US & UK
Design and Built Equipment.
Typical other projects included Major replacement of Factories Electrical HV & MV Distribution and
Switchgear, Hydrochloric Acid Storage and Distribution Installation, Raw Product Conditioning Upgrade,
Development of New Product Processing Equipment, and Effluent Control/Discharge Upgrade.
ISR
1972 – 1976
Instrument Engineer :
Responsible for all site Control System and management of Instrument Department/Personnel.
Pilkington Glass
1968 – 1972
Instrument Technician:
Maintenance & Fault Finding on site Instrumentation.
1963 – 1968
National Coal Board
Electrical Apprenticeship: -
My Typical Day:
Previous to this up at 0700 hrs, Coffee, cereal then travel to work, arrive 745hrs to find what a mess happened over night that I need to fix…
Other jobs include work on Monday in UK then Germany Tues/Wed. UK thurs/Fri. Then repeat over again on Monday. Only difference is visit France instead of Germany.
Other job: spend 3 months in the desert in Saudi Arabia design and build electrical & process systems, home for 3 weeks then repeat.
Other job: Design and build Electrical, Control System and Process plant for UK and Australian Food manufacturing facility.
-
Read more
Other job Design and build Offshore and Subsea Systems for Offhsore.
-
What I'd do with the prize money:
Spend it.
-
Education:
Secondary Education at Local Secondary Modern School near Wigan.
Then Day release at Wigan Technical College.
-
Qualifications:
5 O levels: 2 ONC ‘s + 2 Endorsements,
HNC Electronics
HNC Endorsements (Control, Computer, Applied Electronics, Electrical),
Council of Engineering Institutes Part II (3 Subjects, Control, Computer,Applied Electronics)
Professional Attainment: Chartered Engineer. Member Institute of Measurement & Control, Associate of Institute Electronic & Radio Engineers.
-
Work History:
See CV
-
My Interview
-
What did you want to be after you left school?
Electrical Engineer, Footballer, Mid distance runner.
Were you ever in trouble at school?
Maybe!
If you weren't doing this job, what would you choose instead?
Anything in Engineering.
Who is your favourite singer or band?
Rolling Stones
What's your favourite food?
No favourites
If you had 3 wishes for yourself what would they be? - be honest!
Health, Wealth and Happiness for my family
-